Your current location: Home > Products > Complex Wall System

Complex wall system

tt娱乐APP,tt娱乐官网,tt娱乐

product type: integrated type

place of origin: China

payment: by T/T

Packing: wooden pallet

lead time: one month

brand: BEST


优博娱乐平台_优博娱乐老虎机_优博娱乐 tt娱乐APP,tt娱乐官网,tt娱乐  
Description:

Product description

Best super-light-weight cement partition wall is created for modern high-rising buildings and ecological residences. It is light in weight, energy-saving and environment friendly. It can be widely used as interior or exterior partition walls, roofing, floors and shaft walls. It can be applied to factory, workshop, restaurant, office, shopping mall, hotel, entertainment building, integrated hose, makeshift house, indoor decoration and makeshift projects.



Installation steps:

1.At position lines, fix rebars on pillars according to drawing plans.

2.Cut the boards according to requirements. Use putty to shape a concavity on side and top of walls. Use a jimmy to jimmy it at the bottom according to position lines and steel screens. Then fasten the top of boards and tighten the sides. Smooth the putty if it comes out. Use a ruler to make sure the boards are upright and use two sets of wood wedges to fasten the bottom of boards.

3.When jimmying, put wedges at bottom of each board so as to fasten them and use rebar tubes to conjunct walls and pillars. Use small stone bricks to fill the bottom and get rid of the wedges when it solidifies.

4.When connecting concavity sides and convexity sides, use adhesives to fill up the gaps and smooth the surface if there is any adhesive coming out. Other installations are same as previous steps.

5.Two sides of the door should be connected to the board above the door as an entirety. The door jamb should be 100mm. Door frame boards and beam boards should have wooden bricks to fasten them to door hole. Embedded parts of door frame boards can be prefabricated at factory or made at site, but must be used curing period (3 days). The joint points of door hole must be sealed and treated with sound-proof and water-proof measures.

6.Firstly paint a layer of 108-glue on walls, and put fiberglass Self-adhesive mesh tape on joint points. Use cement and 108-glue to smooth the surface of boards

7. After finishing every partition, check and adjust the whole project and make sure the installation is qualified. Finally use putty to fasten the fiberglass Self-adhesive mesh tape 
 

  tt娱乐网址|tt娱乐APP|tt娱乐
亚虎娱乐手机登录_亚虎娱乐平台_亚虎娱乐 必赢亚洲注册,信誉保障的娱乐平台 必赢亚洲平台,信誉保障的娱乐平台 tt娱乐APP,tt娱乐官网,tt娱乐
申博娱乐网|申博娱乐网址|申博娱乐 tt娱乐APP,tt娱乐官网,tt娱乐 申博娱乐网址,申博娱乐手机登录,申博娱乐 亚虎娱乐网,亚虎娱乐手机登录,亚虎娱乐
申博娱乐登录,申博娱乐平台,申博娱乐 尊宝娱乐平台,尊宝娱乐登录,尊宝娱乐 优博娱乐APP|优博娱乐注册|优博娱乐 皇冠娱乐网,皇冠娱乐手机登录,皇冠娱乐
tt娱乐网址|tt娱乐APP|tt娱乐 优博娱乐手机版,优博娱乐官网,优博娱乐 利来娱乐APP_利来娱乐官网_利来娱乐 优博娱乐注册_优博娱乐登录_优博娱乐
漫赢娱乐城|全新的老虎机平台 利来娱乐登录_利来娱乐网址_利来娱乐 tt娱乐登录,tt娱乐注册,tt娱乐 申博娱乐注册,申博娱乐网,申博娱乐